Upgrade Network Connectivity at Willow Creek Building (WCB) (Idaho Falls [IF]-616) 2nd Floor West CX(s) Applied: B1.7Date: 07/20/2016 Location(s): IdahoOffices(s): Nuclear Energy
High Temperature Tribological Performance of Ni Alloys Under Helium Environment for Very High Temperature Gas Cooled Reactors (VHTRs) [RC-2.3] Helium Tribology for HTGRs – Texas A&M University CX(s) Applied: B3.6Date: 07/18/2016 Location(s): IdahoOff...
Radiation Monitoring and Seal System (RMSS) Stack Monitor and Damper Replacement CX(s) Applied: B2.5Date: 07/14/2016 Location(s): IdahoOffices(s): Nuclear Energy
Modify Rapid Insertion Port Argon Panels in the Hot Fuels Examination Facility CX(s) Applied: B2.2Date: 07/14/2016 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-621 Fume Hood Removal CX(s) Applied: B1.15Date: 07/14/2016 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-670 New Window in Advanced Test Reactor Production Control Center CX(s) Applied: B2.1Date: 42563 Location(s): IdahoOffices(s): Nuclear Energy
Cask Mis-Loads Evaluation Techniques CX(s) Applied: B3.6Date: 07/12/2016 Location(s): IdahoOffices(s): Nuclear Energy
Submarine Glovebox Atmosphere Control Upgrade and Modifications CX(s) Applied: B1.31Date: 42558 Location(s): IdahoOffices(s): Nuclear Energy
Replace Willow Creek Maintenance Building Dial Room Air Conditioner CX(s) Applied: B1.4Date: 42558 Location(s): IdahoOffices(s): Nuclear Energy
Research and Teaching Equipment for Nuclear Materials Characterization CX(s) Applied: B1.31Date: 07/07/2016 Location(s): IdahoOffices(s): Nuclear Energy