ThermoLift - The Natural Gas Fired Air Conditioner & Heat Pump CX(s) Applied: A9, B3.6 Date: 08/28/2013 Location(s): New York Offices(s): Golden Field Office
Intelligent Blow Out Preventers RAM Actuation Sensor System CX(s) Applied: A9, B3.6 Date: 08/28/2013 Location(s): New York Offices(s): National Energy Technology Laboratory
Driving CZTS to the SQ limit: Solving the Open Circuit Voltage Problem CX(s) Applied: A9, B3.6 Date: 08/27/2013 Location(s): New York Offices(s): Golden Field Office
Faith-Based Institutional Demonstration and Crowdsource Funding CX(s) Applied: A9, A11, B5.1 Date: 08/21/2013 Location(s): New York Offices(s): Golden Field Office
Cleaning of the L4 Pump House Galley, Trash Rack, Concrete Inlet Channel and Settling Tank CX(s) Applied: B1.3, B1.5 Date: 08/21/2003 Location(s): New York Offices(s): Naval Nuclear Propulsion Program
Comprehensive Solutions for Integration of Solar Resources into Grid Operations CX(s) Applied: A9, A11 Date: 08/19/2013 Location(s): New York Offices(s): Golden Field Office
Innovative High-Performance Deposition Technology for Low-Cost Manufacturing of OLED Lighting CX(s) Applied: B3.6 Date: 07/18/2013 Location(s): New York Offices(s): National Energy Technology Laboratory
Construction of an Autogas Refueling Network CX(s) Applied: B5.22 Date: 07/18/2013 Location(s): New York Offices(s): National Energy Technology Laboratory
Replacement Ventilation System for the Main Plant Process Building CX(s) Applied: B6.3 Date: 07/11/2013 Location(s): New York Offices(s): West Valley Demonstration Project
Conversion of Waste Carbon Dioxide and Shale Gas to High Value Chemicals CX(s) Applied: A9, B3.6 Date: 07/01/2013 Location(s): New York, New York, New York Offices(s): Golden Field Office