Dworshak-Taft Insulator Replacement, Mile 76 to Mile 89 CX(s) Applied: B1.3Date: 42565 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Development of a Physically Based Creep Model Incorporating Eta Phase Evolution CX(s) Applied: A9, B3.6Date: 42563 Location(s): Multiple LocationsOffices(s): National Energy Technology Laboratory
Oxygen Binding Materials and Highly Efficient Modular System for Oxygen Production CX(s) Applied: A9, A11, B3.6Date: 42562 Location(s): Multiple LocationsOffices(s): National Energy Technology Laboratory
Continuous Water Quality Sensing for Flue Gas Desulfurization (FGD) Wastewater CX(s) Applied: A9, B3.6Date: 42562 Location(s): Multiple LocationsOffices(s): National Energy Technology Laboratory
Phase II Field Demonstration at Plant Smith Generating Station (Phase Two) CX(s) Applied: A1, A9, B3.1, B3.6, B3.7Date: 42562 Location(s): Multiple LocationsOffices(s): National Energy Technology Laboratory
The Fundamental Creep Behavior Model of Gr.91 Alloy by Integrated Computational Materials Engineering (ICME) Approach CX(s) Applied: A9, B3.6Date: 42562 Location(s): Multiple LocationsOffices(s): National Energy Technology Laboratory
Developing and Validating Pressure Management and Plume Control Strategies in the Williston Basin through a Brine Extraction and Storage Test (BEST) - Phase Two CX(s) Applied: A9, B3.1, B3.6, B3.7Date: 42562 Location(s): Multiple LocationsOffices(s): N...
Narrow Emitting Red Phosphors for Improving pcLED Efficacy CX(s) Applied: A9, B3.6Date: 42561 Location(s): Multiple LocationsOffices(s): National Energy Technology Laboratory
Development of Low-Leakage Seals for Utility-Scale SCO2 Turbines (Phase Two) CX(s) Applied: A1, A9, B3.6Date: 42561 Location(s): Multiple LocationsOffices(s): National Energy Technology Laboratory
Ceramic Matrix Composite Advanced Transition for 65% Combined Cycle Efficiency (Phase Two) CX(s) Applied: A1, A9, B3.6Date: 42559 Location(s): Multiple LocationsOffices(s): National Energy Technology Laboratory