Design for High Performance Sustainable Building Modifications Based on E4 Report - PGH CX(s) Applied: B1.15, B1.23, B2.2 Date: 09/12/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Clean Cities Refueling Infrastructure for Alternative Fuels - Phase Three CX(s) Applied: B5.22 Date: 09/12/2012 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Design for High Performance Sustainable Building Modifications Based on E4 Report - MGN CX(s) Applied: B1.15, B1.23, B2.2 Date: 09/12/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Fast Dynamic Simulation-Based Small Signal Stability Assessment and Control CX(s) Applied: A9 Date: 09/12/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory
Clean Cities Refueling Infrastructure for Alternative Fuels (Revised Phase 2) CX(s) Applied: B5.22 Date: 09/12/2012 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Water Management in Mature Oil Fields Using Advanced Particle Gels CX(s) Applied: A9 Date: 09/12/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Water Management in Mature Oil Fields Using Advanced Particle Gels CX(s) Applied: A9, B3.6 Date: 09/12/2012 Location(s): Missouri Offices(s): National Energy Technology Laboratory
Trailers 40, 43, and 45 Lateral Force Resisting System and Roof Re-Coating Project CX(s) Applied: B1.3, B2.2 Date: 09/11/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Oxy-Fired Pressurized Fluidized Bed Combustor Development and Scale-Up for New and Retrofit CX(s) Applied: A9 Date: 09/11/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory
Basin-Scale Produced Water Management Tools and Options CX(s) Applied: A9, B3.1 Date: 09/11/2012 Location(s): Utah, Utah Offices(s): National Energy Technology Laboratory