Pulsed Joining of Body-In-White Components CX(s) Applied: B3.6 Date: 09/09/2013 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Injecting Carbon Dioxide into Unconventional Storage Reservoirs in the Central Appalachian Basin... CX(s) Applied: B3.1, B5.3, B5.5, B5.13 Date: 09/09/2013 Location(s): Tennessee Offices(s): National Energy Technology Laboratory
Small-Scale Enhanced Coalbed Methane Test CX(s) Applied: B3.1, B5.3, B5.5, B5.13 Date: 09/09/2013 Location(s): Virginia Offices(s): National Energy Technology Laboratory
Brazing Dissimilar Metals with a Novel Composite Foil CX(s) Applied: B3.6 Date: 09/09/2013 Location(s): Maryland Offices(s): National Energy Technology Laboratory
Dealloying, Microstructure and the Corrosion/Protection of Cast Magnesium Alloys CX(s) Applied: B3.6 Date: 09/06/2013 Location(s): Arizona Offices(s): National Energy Technology Laboratory
Support for the NETL's Waste Treatment and Immobilization Plant Project CX(s) Applied: A1, A9, A11 Date: 09/04/2013 Location(s): CX: none Offices(s): National Energy Technology Laboratory
SOFC Systems with Improved Reliability and Endurance CX(s) Applied: A1, A9, B3.6 Date: 08/29/2013 Location(s): CX: none Offices(s): National Energy Technology Laboratory
SOFC Systems with Improved Reliability and Endurance CX(s) Applied: A1, A9 Date: 08/29/2013 Location(s): Colorado Offices(s): National Energy Technology Laboratory
SOFC Systems with Improved Reliability and Endurance CX(s) Applied: A1, A9, B3.6 Date: 08/29/2013 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
Deep Controlled Source Electromagnetic Sensing: A Cost Effective, Long-Term Tool for Sequestration Monitoring CX(s) Applied: A1, A9 Date: 08/29/2013 Location(s): California Offices(s): National Energy Technology Laboratory