I-75 Green Corridor Project CX(s) Applied: B5.22 Date: 05/22/2014 Location(s): Florida Offices(s): National Energy Technology Laboratory
Advanced Climate Control and Cabin Preconditioning using Zonal Distribution, Advanced Heat Pump… CX(s) Applied: B5.1 Date: 05/22/2014 Location(s): Michigan Offices(s): National Energy Technology Laboratory
MRCSP Phase III (Dennison Disp#1 (SWIW#11) Well Characterization) - Subtask 1.6 CX(s) Applied: B3.11 Date: 05/21/2014 Location(s): Ohio Offices(s): National Energy Technology Laboratory
GM Lithium Ion Battery Pack Manufacturing - Supplemental Work CX(s) Applied: A9, A11 Date: 05/21/2014 Location(s): Michigan Offices(s): National Energy Technology Laboratory
GM Lithium Ion Battery Pack Manufacturing - Supplemental Work CX(s) Applied: B4.13 Date: 05/21/2014 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Ion Advanced Solvent Carbon Dioxide Capture Pilot Project (Budget Period 1) CX(s) Applied: A9, A11 Date: 05/21/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Reduced Mode Sapphire Waveguide and Distributed Sensing System CX(s) Applied: B3.6 Date: 05/13/2014 Location(s): Virginia Offices(s): National Energy Technology Laboratory
Arc Flash Hazard Mitigations - Morgantown CX(s) Applied: B1.15, B2.5 Date: 05/12/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
System-Cost Optimized Smart EVSE for Residential Application (New Tasks 101 and 102) CX(s) Applied: A1, A9, A11 Date: 05/12/2014 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Subsea High Voltage Direct Current Connectors for Environmentally Safe and Reliable Powering of UDW… CX(s) Applied: A9, A11, B3.6 Date: 05/09/2014 Location(s): Connecticut Offices(s): National Energy Technology Laboratory