Quantitative Characterization of Impacts of Couple Geomechanics and Flow - Lab Experiments/Modeling CX(s) Applied: B3.6 Date: 06/25/2014 Location(s): California Offices(s): National Energy Technology Laboratory
I-75 Green Corridor Project CX(s) Applied: B5.22 Date: 06/25/2014 Location(s): Florida Offices(s): National Energy Technology Laboratory
I-75 Green Corridor Project CX(s) Applied: B5.22 Date: 06/25/2014 Location(s): Florida Offices(s): National Energy Technology Laboratory
Nanostructured Silica Sorbent for Carbon Capture CX(s) Applied: B3.6 Date: 06/23/2014 Location(s): Delaware Offices(s): National Energy Technology Laboratory
Vertically Aligned Carbon-Nanotubes Embedded in Ceramic Matrices for Hot Electrode Applications CX(s) Applied: B3.6 Date: 06/23/2014 Location(s): Nebraska Offices(s): National Energy Technology Laboratory
Building 36 Use Permit CX(s) Applied: A9 Date: 06/23/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Integration of Advanced NETL-RUA Cooling Concepts into Airfoils Tested in PSU Rig CX(s) Applied: A9 Date: 06/23/2014 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
Integration of Advanced NETL-RUA Cooling Concepts into Airfoils Tested in PSU Rig CX(s) Applied: A9 Date: 06/23/2014 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
B14 Renovation CX(s) Applied: B1.4, B1.15, B2.1 Date: 06/23/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Carbon Absorber Retrofit Equipment (CARE) - Site Relocation CX(s) Applied: B3.6 Date: 06/23/2014 Location(s): Colorado Offices(s): National Energy Technology Laboratory