Albany Natural Gas and Water Metering CX(s) Applied: B1.7, B2.2Date: 06/11/2015 Location(s): OregonOffices(s): National Energy Technology Laboratory
B-3 Reactor Laboratory CX(s) Applied: B3.6Date: 06/11/2015 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Chemical Kinetic Modeling Development and Validation Experiments CX(s) Applied: A1, A9, B3.6Date: 06/10/2015 Location(s): FloridaOffices(s): National Energy Technology Laboratory
B-33 HVAC Upgrades CX(s) Applied: B1.3, B2.1, B2.2Date: 06/10/2015 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
OLED Luminaire with Panel Integrated Drivers and Advanced Controls CX(s) Applied: B3.6Date: 06/09/2015 Location(s): CaliforniaOffices(s): National Energy Technology Laboratory
Pressurized Testing of Solid Oxide Fuel Cells CX(s) Applied: B3.6Date: 06/05/2015 Location(s): Rhode IslandOffices(s): National Energy Technology Laboratory
PHEV Demonstration Project and Social Media Campaign CX(s) Applied: A1, A11, B3.6, B5.1Date: 06/05/2015 Location(s): MichiganOffices(s): National Energy Technology Laboratory
Luminaires for Advanced Lighting in Education CX(s) Applied: B3.6Date: 06/04/2015 Location(s): North CarolinaOffices(s): National Energy Technology Laboratory
Prevention and Remediation of Sustained Casing Pressure (Phase 2) (Project# 11122-42) #2 CX(s) Applied: A9, A11, B3.6, B3.9Date: 06/02/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Prevention and Remediation of Sustained Casing Pressure (Phase 2) (Project# 11122-42) #5 CX(s) Applied: A9, A11Date: 06/02/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory