Preparing, patching, and repainting all exterior surfaces of the six-story tower.…
Demolish and replace the existing fence by Building 25.…
Remove the end of life asphalt roof shingles, overlay existing wood deck with 0.5" plywood, and install new 35 year asphalt shingles.…
Fabrication of mixed potential sensors, testing of mixed potential sensors, training of artificial neural network, and electronics construction for…
The work performed in the Biogeochemical processes lab investigates changes in microbial ecology, geochemistry, and geology driven by energy indust…
The objectives of the project are to design, build, and test a high-pressure linear motor leak recovery compressor for cost effective recovery of m…
This CX is for Subtask 3.2 Produced Water Management Through Geologic Homogenization, Conditioning and Reuse under DOE Project DE-FE0024233.…
Computer data analysis, computer modeling and simulation, and project reporting. Lab work to manufacture and test self-healing diaphragms in a gas …
Design, synthesis, and characterization of metal-silica single atom catalysts for industrial scale non-oxidative methane aromatization and convers…