Fully Fluorinated Local High Concentration Electrolytes Enabling High Energy Density Si Anodes …
Optimization and Evaluation of Energy Savings for Connected and Autonomous Off-Road Vehicles …
Preparation of lab samples includes sectioning, mounting (hot and cold methods), planar grinding, polishing, heat treating, chemical etching, and e…
Replace Substation 6 electrical switchgear and associated items-fencing, concrete pad, etc.…
Rational Electrolyte Design for Li-ion Batteries with Micro-Sized Si Anodes…
The objective is to design, construct, and test a novel, high-performance CO electrolysis reactor that produces two concentrated product streams: e…
Remodel the 1st and portions of the 2nd floors of B17 East Wing to provide updated offices with new furniture, doors, and fire suppression system, …
This project includes replacement of the potable and fire water pipes on the NETL PGH R and D Plateau near the B-95 entrance gate and the Northeast…
Replace existing B-84 Summer Boiler and associated pumps and controls.…
Renovate existing first floor space on the north end of the building and construct a two-story building addition for the new Data Center.…