B26 ground floor will be retrofitted from the main conference room down to the G22 area, carpet, lights, ceiling tiles, paint, etc. …
The objective of Phase II is to build on the pre-FEED work completed in Phase I and be prepared to begin a detailed engineering design and construc…
USGS will measure surface water methane and CO2 concentrations and other parameters required to calculate the sea-air exchange of these greenhouse …
RTI proposes to design and engineer novel surface treatments and secondarily applied remediation components to mitigate biofilm growth on condenser…
Laboratory-based examinations of rich gas interactions with reservoir fluids and tight rocks
Work will consist of conducting a pilot test involving the installation of interval control valves (ICVs) into existing horizontal injection and pr…
This project will develop and demonstrate a new technology for large-volume and targeted comminution of rock in low permeability formations to enha…
The overall goal of the proposed project is to design and build a pilot plant to facilitate performance assessment, to acquire operational experien…
Establish the Caney Shale Field Laboratory. Characterize, investigate, and validate the Caney Shale as an emerging unconventional shale play.…