Administrative and project management activities
Idaho National Laboratory (INL) is revising this environmental checklist (EC) from a second tier EC to a first tier EC and to clarify project scope…
Design, construction, and operation of oil flow loop.…
Assembly and programming of prototype modules for field testing and deployment.…
NETL will develop a high temperature and high pressure reactor to simulate subsurface conditions which will allow the study and development of sens…
Develop tool for communities to use to size a Grid Bridging System (GBS) that will provide short term power need and test GBS for performance and e…
The University of Arkansas will develop AVIRA to automate the process of risk assessment, prioritizing.…
Computer data analysis, computer modeling, project reporting. Lab work to synthesize, optimize, and test a working prototype of a membrane for sepa…
Completion of FEED study, NEPA, and permitting for 10 MWe CO2 absorption pilot at CWLP host site, TEA update, and updating costs and schedules for …