The major outcome will potentially be a syngas cleanup train demonstrated to yield a coal syngas capable of sustaining SOFC performance equal to th…
Demo/removal of the windows/panels on the east wall of Building 83 at the NETL Pittsburgh Site and the replacement of these windows/panels with a c…
This project will support efforts to develop, demonstrate, and deploy cyber and cyber-physical solutions for utilities. This review only covers R a…
The objective is to establish an industry-acceptable standard heat rate test method and annual heat rate calculation protocol (ASME Code) for coal-…
Medium-duty eTruck: Pilot Electrified Fleets in Urban and Regional Applications…
The objective is to develop a continuous motion Direct Air Capture (DAC) system that will capture CO2 from the air and produce a >95 percent purity…
Remove and repoint deteriorated mortar joints as necessary. Cut-out and caulk cracks in masonry with a high strength/low modulus epoxy. Patch exist…
The Geomechanics and Flow Lab will combine three previously permitted NETL labs: GGSCFL, Degradation of Wellbore Cements Due to CO2 Injection, and …
An initial engineering design study for carbon capture plant for an ethanol facility.…
The project will test a CO2 elective membrane on a slip stream of flue gas from a coal-fired plant.…