The objective is to demonstrate feasibility of modular, coal-based building prototypes where building components are coal derived with properties m…
Collect 500g samples of coal sediment and coal derived waste materials from existing road and railroad right-of-ways, retention ponds, and waste pi…
Activities include standard office/clerical work and also the research and development of a methane mitigator system within the laboratory, includi…
V-INT will automate and prioritize patches for vulnerabilities so that more critical patches are applied first, reducing stress on electric utiliti…
The teams will aid states in gathering information for electronic permitting of oil and gas activities
Develop mini-guide for public utility commissioners.…
Perform a FEED study to facilitate a future investment decision in a DAC hub project by validating the commercial case for utilizing nuclear energy…
Conduct 2D Seismic Survey along existing public roads in Washington and St. Clair Counties, IL.…
Semi-airborne electromagnetic surveys will be conducted over a 2 square mile area surrounding two proposed CO2 injection wells at Kemper CarbonSAFE…
The purpose of this project is to develop new separation processes/technologies that can handle high salinity brines in an energy efficient manner.…