Develop (Phase 1 - 2 years) and then demonstrate (Phase 2 - 1 year) on lab scale grid simulators a computer framework for identifying and tracking …
Project management, simulations work, development and characterization of catalysts and membranes for hydrogen production, continuous operation of …
Fundamental research on cybersecurity of electric power systems. R and D in Phase I (two years) and Demonstration in Phase II (1 year).…
Conduct a scoping study and university-wide self-assessment to evaluate how the Recipient’s current capabilities, expertise, personnel, and facilit…
Development of hardware and software for a drone
This project will perform TEAs and LCAs associated with the use of waste coal and biogas to generate electricity and "net-negative" carbon dioxide …
Installation of the developed retrofit unit including an air management system, sensors, solar power unit, and control box.…
Develop novel oxygen carrier materials for testing in a lab scale moving bed gasification system. Integrate gasifier with syngas conversion process…
Kauai Island Utility Cooperative (KIUC) proposes to purchase, install, operate, and maintain a lithium-ion battery energy storage system (BESS) at …
Identify optimal conditions of biomass/torrefied biomass and coal refuse cofiring to produce carbon-neutral or carbon-negative power generation fro…