Development and field deployment of a universal low-cost emissions reduction retrofit kit for industrial engines.…
The project will model, design, and implement different stimulation strategies and utilize fiber optics to monitor the effectiveness of these strat…
Design, development, lab testing, and field testing of an Oxiperator for oxidizing methane slip from lean burn natural gas engines.…
Meet objective stated in Section I. C. of DE-FOA-0002364. Assess and study a pathway for Alaska's Rare EarthElements and Critical Minerals. Additio…
WVU and its partners will establish short and long-term methane monitoring stations at select operator field locations in order to quantify methane…
Adding E9 Insight who will conduct routine administrative, technical assistance, and workshop-related activities. …
The project will develop database on storage tanks and equipment, develop emission factors for tanks, understand causes, frequencies, and rates of …
Collection of both coal refuse feedstock and fluidized bed combustion (FBC) ash at these FBC/Waste Coal Power Plant Facilities. We will collect 30 …
Front-End Engineering Design study to capture CO2 emissions from flue gas generated at Calpine’s Deer Park Energy Center NGCC power plant. U Housto…
Assess the reactivity of mafic and ultramafic formations and crushed mine and industrial wastes with CO2, and their post-mineralization physical pr…