Remove the three phase overhead power line located on the East side of US-75 from the service pole for One Fire Casino, North to the intersection o…
Install five (5) new monitoring and control points on existing utility poles in existing ROW.…
Rebuild three-phase Duke Energy line in existing ROW. Cut 1.1 miles of ROW along West McConnells HWY and install new single phase phase pole line …
Purchase of enhanced resiliency insulators and storm-hardened metal poles…
Installation of new equipment on existing poles that will allow a self healing network to automatically isolate and restore power, within seconds, …
Conversion of 4.0 miles of existing overhead distribution line from three-phase 4/0 ACSR to 477 ACSR on wooden poles using a spacer cable support s…