Engineering design and analysis, program management, HAZOP review, EH
Bonneville Power Administration proposes to fund the Columbia River Inter-tribal Fisheries Commission (CRITFC) to use genetic analysis techniques to evaluate the relative reproductive success of tribal hatchery programs and provide personnel to assist sampling efforts.
Bonneville Power Administration (BPA) is proposing to upgrade equipment at the following substations: Calpine, Coyote Springs, McNary, McNary Powerhouse, Pendleton, Ross, Roundup, Slatt, and Walla Walla.
The Energy Policy and Conservation Act, as amended requires the U.S. Department of Energy (“DOE”) to periodically determine whether more-stringent,…
In this final rule DOE revises the current definition of “showerhead” adopted in a December 16, 2020 final rule by reinstating the prior definition…
In this final rule, DOE proposes to revise the Department’s test procedure interim waiver process.…
The objective of the project is to complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture system at cement…
Bonneville Power Administration (BPA) proposes to conduct activities listed below to operate and maintain high voltage electrical facilities throughout the BPA service territory.
This Amended Determination follows the approval of additional funds to support the project team's small-scale, research and development activities …
Funding will support the project team's information gathering and analysis efforts to transition the Hydro-FE-a simulation tool uniquely capable of…