Funding will support the project team's small-scale research and development of a hybrid electric flying testbed for integration into aircraft whic…
DOE proposes to adopt test procedures for consumer products, and commercial and industrial equipment that manufacturers of covered equipment must u…
This Performance-Based Management Contract (PBMC) is for the management and operation of the Strategic Petroleum Reserve (SPR) crude oil facilities…
The project team will continue testing using simulations and on-site demonstration testing, and continue refining the sensor and software design.…
The contractor shall provide all equipment, parts, tools, programming software, supplies, transportation, facilities, labor, and supervision necess…
Specifically, the project team will (1) acquire and install equipment in their existing facility to produce magnet precursor materials for use in p…
Funding will support the project teams small-scale research and development of a non-thermal graphene oxide membrane technology for separation of b…
Funding will support the project team's small-scale research and development of an Iron Nitride-based Clean Earth Magnet(TM), made from abundant co…
The project team will optimize the resolution and throughput performance of the existing in-ground system.…