Funding will support the project team's information gathering and analysis efforts to develop a a Wind Energy with Integrated Servo-control (WEIS) …
This NEPA CX will cover all activities performed under TA3-Phase 2 (implementation), which may include direct education, train-the-trainer,broader …
The U.S. Department of Energy (DOE) is proposing to authorize the administration of a grant program (Industrial Assessment Center (IAC) Implementat…
HALO pilot-scale fabrication, testing and validation. HALO modeling, management, and lab-scale and prototype testing and validation.…
Collection of both upstream (feed) and downstream (effluent)from the acid mine drainage treatment facility on site. It is anticipated that 8 liters…
Engineering design and analysis, program management, HAZOP review, EH and S risk assessments, TEA, LCA…
Project management, material procurement, laboratory-scale moving-bed gasifier testing of developed fuel pellets, modeling, market review…
Feasibility study to define and assess a subsurface geologic CO2 storage complex offshore in Corpus Christi, Texas. …
Bonneville Power Administration (BPA) proposes to apply fire retardants to select wood poles throughout the BPA service territory.…
To create a comprehensive engineering, design, deployment, and operation plan for continuous CH4 monitoring and reporting system that can accelerat…