This NEPA CX will cover all activities performed under TA3-Phase 2 (implementation), which may include direct education, train-the-trainer,broader …
The U.S. Department of Energy (DOE) is proposing to authorize the administration of a grant program (Industrial Assessment Center (IAC) Implementat…
HALO pilot-scale fabrication, testing and validation. HALO modeling, management, and lab-scale and prototype testing and validation.…
Collection of both upstream (feed) and downstream (effluent)from the acid mine drainage treatment facility on site. It is anticipated that 8 liters…
Engineering design and analysis, program management, HAZOP review, EH and S risk assessments, TEA, LCA…
Project management, material procurement, laboratory-scale moving-bed gasifier testing of developed fuel pellets, modeling, market review…
Feasibility study to define and assess a subsurface geologic CO2 storage complex offshore in Corpus Christi, Texas. …
Bonneville Power Administration (BPA) proposes to apply fire retardants to select wood poles throughout the BPA service territory.…
To create a comprehensive engineering, design, deployment, and operation plan for continuous CH4 monitoring and reporting system that can accelerat…
Bonneville Power Administration (BPA) is proposing to replace its aging VHF radio system at host facilities with a simple, modern, VHF two-way radi…