Phase II Onshore CarbonSAFE project to to establish the feasibility and cost of commercial deployment of geological carbon-storage technologies in …
Develop an integrated technology to produce high value energy critical metals with inherent carbon dioxide (CO2) capture and mineralization at the …
This document covers the support activities of equipment rental, purchase of materials (pipe casing, etc.) and services under FFPO supervision for …
Assess the feasibility of volume, long-term storage of hydrogen in the subsurface through data collection
Conduct Methane sensing survey at Coal Basin using drone, helicopter or ground-based methods. Deploy stationary methane sensing devices to measure…
In budget period 1, Xcimer Energy will conduct design, simulation and modeling of systems leading to a pre-conceptual design for a pilot plant prod…
Bonneville Power Administration (BPA) proposes to replace 58 deteriorating wood poles and associated structural/electrical components (e.g. cross a…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Interstate Renewable Energy Council (IREC) to expand the Solar R…