Deployment and Retrieval System for Cross-flow Hydrokinetic Turbines CX(s) Applied: B3.6, B5.25Date: 03/03/2016 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Test Procedures for Measuring Energy Efficiency of Consumer Products and Industrial Equipment Not Entered CX(s) Applied: A5, A6 EERE-Buildings Technology Program Date: 03/02/2016 Location(s): Nationwide Office(s): Golden Field Office
Final Rulemaking for Energy Conservation Standards for Residential Dehumidifiers (RIN: 1904-AC81) RIN 1904-AC81 CX(s) Applied: B5.1 EERE-Buildings Technology Program Date: 03/02/2016 Location(s): Nationwide Office(s): Golden Field Office
Big Hill Remote Control for Pipeline Valve BH-3 CX(s) Applied: B1.3Date: 03/01/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
API 653 Inspection of BMT-2 Prior to Conversion CX(s) Applied: B1.3Date: 03/01/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Final Rule for Regulatory Amendments for Central Air Conditioners and Heat Pumps RIN 1904-AD08 CX(s) Applied: A6 EERE-Buildings Technology Program Date: 03/27/2014 Location(s): Nationwide Office(s): Golden Field Office
U.S. Department of Energy Solar Decathlon 2015 Award Number: DE-FOA-0000959 CX(s) Applied: A9 Building Technologies Office Date: 03/26/2014 Location(s): Mult Office(s): Golden Field Office
Transforming PV installations toward dispatchable, schedulable energy solutions Award Number: DE-EE0005340 CX(s) Applied: A9, B3.6 Solar Energy Technologies Office Date: 03/26/2014 Location(s): Mult Office(s): Golden Field Office
Industrial Assessment Centers Award Number: DE-FOA-EE0001513 CX(s) Applied: A9, A11 Solar Energy Technologies Office Date: 02/25/2016 Location(s): Nationwide Office(s): Golden Field Office
Bearmouth Microwave Radio Communication Facility CX(s) Applied: B1.19Date: 02/24/2016 Location(s): MontanaOffices(s): Bonneville Power Administration