Existing data analysis to determine location for newly drilled Geo-laboratory test well. …
Bonneville Power Administration (BPA) is proposing to upgrade equipment at Longview Substation, the Longview Annex, and Allston Substation. The wor…
To produce a complex cooled turbine vane from additively manufactured (AM) ceramic matrix composite (CMC) materials enabled by stereolithography. …
To use AM (additive manufacturing) technology to develop improved overall cooling effectiveness for turbine components, particularly vanes and blad…
Multiple candidate energy storage options for fossil fuel-based power plants will be evaluated before selecting the most promising concepts for whi…
To develop a physics-based concurrent multiscale framework to model the highly nonlinear temperature and time dependent damage mechanisms and mater…
Develop a cost-effective quality assurance (QA) method that can rapidly laser powder fusion (LPBF) additive manufacturing (AM) technology for hot g…
Contractor to provide all necessary management and administrative oversight, screening, training, labor, and supplies to provide physical security …
Bonneville Power Administration (BPA) proposes to upgrade its VHF mobile radio system at BPA communication sites throughout its Mobile Radio Essent…
The objective of Phase II is to perform Front-End Engineering Design (FEED) study, NEPA documentation, and finalize project cost projections for th…