Demonstrate the feasibility of structures and components for advanced energy power cycle by fusion welding powder metallurgy (PM) based near net sh…
NRECA will develop tunable, adoptable code for cycling costs of large coal boilers. It will comprise: a) a system level physics-based model
Support DOE in meeting the DOE GMD and EMP goals, providing high quality deliverables to fulfill the DOE tasks directed in the Executive Order on E…
The project team will complete a Front-End Engineering & Design (FEED) study on the addition of a post-combustion carbon capture system onto an exi…
The primary objectives of the research are to address key challenges of CCUS projects, facilitate data collection, sharing and analysis, assess tra…
The Provo River Project consists of a powerplant on a dam at Deer Creek on the Provo River in central Utah. The Deer Creek power station has an ins…
Western Area Power Administration proposes a 5-year Provo River Project Firm Power Formula Rate through March 31, 2025, which is unchanged from the…
Research project is to establish a tight oil Field Lab in the Powder River Basin used to characterize & overcome challenges of developing emerging …
Use the existing REE pilot plant to integrate and test new technologies and circuits that will significantly reduce the cost of producing REO mixes…