NEPA action levels for planned changes as defined in the Internal Procedure (IP00l)- How to Comply with the National Environmental Policy Act (NEPA…
This document covers the support activities of equipment rental, purchase of materials, and services under FFPO supervision for oil caverns and bri…
Workover (operations to restore production, such as deepening, plugging back, pulling and resetting lines, and squeeze cementing) of existing wells (including, but not limited to, activities associated with brine, carbon dioxide, coalbed methane, gas hydrate, geothermal, natural gas, oil) to restore functionality,
The SLCA/IP consists of the CRSP units and its participating projects, Dolores and Seedskadee, as well as two small individual projects, Rio Grande…
Install the 200kW SOFC system prototype at FCE, CT. Disengage/Disassemble one of the 100 kW Modules for postmortem autopsy at Versa. Continue opera…
R&D Phase I:Design RoT based CybSec framework, Design, Develop, Simulate GridTrust in-Grid and supply chain context. Demo Phase II:GridTrust in GA …
Operate bench-scale experiments on amine oxidation. Operate amine scrubbing pilot plant.…
The REDCS project has two main phases:Phase I cybersecurity R&D to continuously monitor pipelines and Phase II-demonstration. This review only cove…
Subcontractor shall furnish all tools, equipment, transportation, labor, and supervision, required to perform the work in connection with the blast…