This project is research, development, and demonstration of a scalable, flexible, and cost-effective cyber-physical platform (CPP) capable of simul…
A lab-scale Sequential Hydrothermal Liquefaction Process system will be used to fractionate components from micro algae biomass for cattle feed and…
Rebuild of approximately 6.25 miles of main line feeder on De Queen Circuit 961100 with heavier class poles, stronger cross arms, and shorter span …
Demonstration of a process in which at least 10,000 tonnes of CO2 will be removed per year from pyrolysis of waste biomass to charcoal utilizing a …
Installation of steel covers over 50 copper transformer grounds at 31 substations to reduce the risk of theft or vandalism. …
Powerex Corp. has applied for renewed authorization to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act (FPA).
Altop Energy Investments LP has applied for authorization to transmit electric energy from the United States to Mexico pursuant to Section 202(e) of the Federal Power Act (FPA).
OIKO Energy Inc. has applied for authorization to transmit electric energy from the United States to Canada pursuant to Section 202(e) of the Federal Power Act (FPA).
XTS LLC has applied for authorization to transmit electric energy from the United States to Mexico pursuant to Section 202(e) of the Federal Power Act (FPA).
Renovation of PGH B-921 and/or MGN B-26 3rd floor to refresh outdated office spaces to support and enhance NETL's workplace improvement strategies.…