The ULTIMATE Program seeks to develop ultrahigh temperature materials for gas turbines, enabling them to operate continuously at 1300º C in stand-a…
Complete Design Development, the Environmental Information Volume (EIV), the investment case, and a FEED study to redevelop the existing Recipient'…
The subcontractor shall provide security alarm monitoring service, system maintenance, and preventive maintenance bi-annually on all security syste…
Western Area Power Administration (WAPA) proposes a 5-year, Colorado River Storage Project (CRSP) Joint Transmission Dispatch Service (JTDS)…
Western Area Power Administration (WAPA) proposes a 5-year, Colorado River Storage Project (CRSP) Joint Transmission Dispatch Service (JTDS) formul…
This Second Amended Determination follows changes to the project team and milestones and the approval of additional funds to support the project te…
Funding will support the project team's information gathering and analysis efforts to develop a framework and testbed for evaluating the potential …
Objective is to integrate the liquid salt combined-cycle (LSCC) design in a combined cycle environment, interfaced with existing natural-gas combin…
Evaluate the feasibility of integrating a 1,000 MWh Malta Pumped Heat Energy Storage system, a long-duration, molten-salt-energy storage technology…
Accelerating AFV Adoption in Mid-America…