This action includes planning and engineering activities to define the configuration and integration of the various systems, structures, components, and processes to remove, relocate and temporarily store DOE TRU waste, which is currently located at the W
This Amended Determination follows the approval of additional funds to support the project team's small-scale, research and development activities to expand sensor capabilities for enhanced geothermal systems (EGS).
The Department of Energy/National Nuclear Security Administration proposes to lease previously developed property to provide laboratory space for bioscience research within a 50-mile radius of Los Alamos National Laboratory (LANL), which may include...
CX-270611: Domestic Atmospheric Radiation Measurement Campaigns (ARM)
Construct a new 10,000 square foot light manufacturing facility at Technical Area 53.
NNSA Los Alamos Field Office issued a CX determination to modify and upgrade the NM 4 and East Jemez Road Intersection at LANL.
The Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Los Alamos Field Office (NA-LA) proposes to construct and operate an
The NNSA is proposing the D and D of structures 41-004 and 41-007, formerly a waste water treatment facility at LANL TA-41...
The U.S. Department of Energy ,DOE, Office of Science, in conjunction with the National Nuclear Security Administration ,NNSA, Los Alamos National La…
NNSA proposes to use LANL, TA-60, Bldg 17, as a treatment and storage facility.