Optimization of Microwave Telecommunication System ON Line Nevada Transmission Project, f.k.a. Southwest Intertie Project - South CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada Offices(s): Loan Guarantee Program Office
One Nevada Optimization of Microwave Telecommunication System CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada, Offices(s): Loan Guarantee Program Office
Wind Tests of Transmission Line Towers: One Nevada Transmission Project CX(s) Applied: B4.6 Date: 03/14/2012 Location(s): Nevada, Nevada Offices(s): Loan Guarantee Program Office
Project Eagle Phase 1 Direct Wafer/Cell Solar Facility CX(s) Applied: B1.31 Date: 01/24/2012 Location(s): Massachusetts Offices(s): Loan Guarantee Program Office
Chrysler Group LLC, Revised Specific Project Application 2, Retooling, Reequipping and EngineeringCX(s) Applied: B1.31, B5.1Date: 09/06/2011Location(s): Auburn Hills, MichiganOffice(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guar...
SoloPower, Inc. Electrodeposition-based Solar Panel Manufacturing Facilities CX(s) Applied: B1.31 Date: 08/15/2011 Location(s): Oregon, California Offices(s): Loan Guarantee Program Office
Project Eagle Direct Wafer Manufacturing Plants CX(s) Applied: B1.23, B1.31 Date: 07/28/2011 Location(s): Massachusetts Offices(s): Loan Guarantee Program Office
Aptera All-Electric and Hybrid Electric VehiclesCX(s) Applied: B1.31, B5.1Date: 06/20/2011Location(s): Grand Rapids, MichiganOffice(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office
OPOC Engine Manufacturing ProjectCX(s) Applied: B1.31, B5.1Date: 06/16/2011Location(s): Troy, MichiganOffice(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office
NORDIC Wind Manufacturing Project CX(s) Applied: B1.31 Date: 06/10/2011 Location(s): Missouri Offices(s): Loan Guarantee Program Office