The US Department of Energy (DOE) is considering whether to issue a Title XVII Innovative Clean Energy Program loan guarantee to Sunnova Energy Cor…
Tuscarora Phase II Geothermal Observation Wells CX(s) Applied: B3.7 Date: 02/22/2013 Location(s): Nevada Offices(s): Loan Guarantee Program Office
Optimization of Microwave Telecommunication System ON Line Nevada Transmission Project, f.k.a. Southwest Intertie Project - South CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada Offices(s): Loan Guarantee Program Office
One Nevada Optimization of Microwave Telecommunication System CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada, Offices(s): Loan Guarantee Program Office
Wind Tests of Transmission Line Towers: One Nevada Transmission Project CX(s) Applied: B4.6 Date: 03/14/2012 Location(s): Nevada, Nevada Offices(s): Loan Guarantee Program Office
Project Eagle Phase 1 Direct Wafer/Cell Solar Facility CX(s) Applied: B1.31 Date: 01/24/2012 Location(s): Massachusetts Offices(s): Loan Guarantee Program Office
Chrysler Group LLC, Revised Specific Project Application 2, Retooling, Reequipping and EngineeringCX(s) Applied: B1.31, B5.1Date: 09/06/2011Location(s): Auburn Hills, MichiganOffice(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guar...
SoloPower, Inc. Electrodeposition-based Solar Panel Manufacturing Facilities CX(s) Applied: B1.31 Date: 08/15/2011 Location(s): Oregon, California Offices(s): Loan Guarantee Program Office
Project Eagle Direct Wafer Manufacturing Plants CX(s) Applied: B1.23, B1.31 Date: 07/28/2011 Location(s): Massachusetts Offices(s): Loan Guarantee Program Office