LM is proposing to conduct routine administrative, site inspection, maintenance, and groundwater monitoring activities at the Site A/Plot M, Illino…
DOE-LM is proposing to upgrade the pore water extraction system at the Rifle, Colorado, Disposal Site to prevent the rising water level in the disp…
LM is proposing to abandon two LM groundwater monitoring wells and approximately 125 previously-owned U.S. Geological Survey groundwater monitoring…
The DOE-LM is proposing to install carports and a patented Beam EV ARC solar-powered level 2 dual-port electric vehicle charging station (EVCS) in …
LM is proposing to conduct routine administrative, monitoring, maintenance, and aerial survey activities to fulfill requirements of the site's Long…
LM is proposing to conduct routine inspections, monitoring, and maintenance activities, and a baseline aerial survey at the Durango Disposal/Proces…
LM is proposing to maintain and repair existing roads at the 8Iuewater, New Mexico, Disposal Site located approximately nine miles northwest of Gra…
DOE-LM is proposing to remove and transport water from the Rifle Disposal Site evaporation pond to the Grand Junction Disposal Site (GJDS) decontam…
LM is proposing to transition the Conquista, Texas, Disposal Site, located approximately 50 miles southwest of San Antonio, to LM ownership and lon…
LM is proposing to conduct routine administrative, monitoring, and maintenance activities at the Canonsburg, Pennsylvania, Disposal Site to ensure …