Categorical Exclusion Determinations issued by Knolls Laboratory.
The primary purpose of the A4 Building Demolition Project is to remove the existing building to allow for the construction of a modern facility with more office space.
The purpose of the Modular Office Building (MOB) Project is to install a temporary office facility for a period of about six years to provide necessary turnaround space for other site facility renovations.
The scope of the Knolls Laboratory General Plant Project funded-Legacy Radio Replacement Project is to replace an aging radio system with a new two-way radio system, which includes an electrical tie-in to an existing emergency power generator.
This project will replace the current UPS flywheel system with a newer, state-of-the-art system.…
The scope of the Knolls Laboratory - East Gate Entrance Upgrade Project (Project) is to increase the size of the East Gate vehicle entry and exit l…
The Knolls Laboratory Well Decommissioning Project is being undertaken to decommission up to seventy-three (73) groundwater monitoring wells across t…
The scope of the Knolls Laboratory Building M11 Construction Project includes thedesign and construction of an approximate 40,000 square foot, mult...
The Knolls Laboratory Building C7 Construction Project covers the design and construction of a new facility to increase space available to support...
Knolls Laboratory-Chemistry Laboratory and Radiological Health Facility, Building T3, Construction Project
The scope of the Knolls Laboratory Outfall 005 Maintenance and Repair Project willinclude the removal of sediment that has accumulated directly upstr…