Due to temperature and moisture extremes, Bldg 6 will be enclosed and environmental controls installed for material quality. …
Perform a vibration and geotechnical engineering study at B23 to understand how the soil and internal and external vibrations could impact equipmen…
KCNSC21-03 cleanup of shrubs/trees along fence and repair/replace damaged or missing fence components.…
Kansas City National Security Campus and New Mexico Operations Routine Operating and Administrative Activities…
Bonneville Power Administration (BPA) proposes to fund ODFW to implement a habitat enhancement and wood placement project at their Flight’s End wil…
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of nineteen wood pole structures and associated structural/electrical…
Preliminary Real Estate Plan for KCNSC New Mexico Operations’ Craddock D Facility …
NEPA action levels for planned changes as defined in the Internal Procedure (IP00l)- How to Comply with the National Environmental Policy Act (NEPA…
Remove four truck ramps utilized for KCRIMS transfer, regrade area, expand parking spaces, rework lighting and fire protection lines. September 20…
Categorical Exclusion Determination