Simpson College Boiler Plant De-Centralization  CX(s) Applied: B5.1 Date: 09/24/2012 Location(s): Iowa Offices(s): Golden Field Office
      Retroactive-Linn Hall Renovation and Installation of a 700 Ton Open Loop Ground Source Heat Pump and Related High Efficiency Heating and Cooling Systems at Kirkwood Community College, Cedar Rapids, Iowa  CX(s) Applied: B5.19 Date: 08/30/2012 Location(s...
      Smarter Electricity Iowa  CX(s) Applied: A9, B5.1 Date: 08/10/2012 Location(s): Iowa, Iowa, Iowa Offices(s): National Energy Technology Laboratory
      Nashua-Plainfield Community Schools Geothermal System  CX(s) Applied: B5.19 Date: 07/26/2012 Location(s): Iowa Offices(s): Golden Field Office
      Iowa State Energy Program Annual Award  CX(s) Applied: A9, A11 Date: 06/25/2012 Location(s): Iowa Offices(s): Golden Field Office
      Demonstration of Pyrolysis Based Biorefinery Concept for Biopower, Biomaterials and Biochar  CX(s) Applied: A9, B3.6, B5.15 Date: 05/21/2012 Location(s): Iowa Offices(s): Golden Field Office
      2009 National Biodiesel Foundation Biodiesel Infrastructure Project  CX(s) Applied: B5.2, B5.22 Date: 05/01/2012 Location(s): Iowa Offices(s): National Energy Technology Laboratory
      Iowa City-Sioux City  CX(s) Applied: A1, B1.32 Date: 04/12/2012 Location(s): Iowa Offices(s): Energy Efficiency and Renewable Energy
      Heavy Duty Roots Expander Heat Energy Recovery   CX(s) Applied: A1, A9 Date: 01/04/2012 Location(s): Iowa Offices(s): National Energy Technology Laboratory
      EL-11-002 East Marshall High School Geothermal Project  CX(s) Applied: B5.19, B2.1 Date: 12/27/2011 Location(s): Iowa Offices(s): Golden Field Office
       
        