2009 National Biodiesel Foundation Biodiesel Infrastructure Project CX(s) Applied: B5.2, B5.22 Date: 10/25/2013 Location(s): Iowa Offices(s): National Energy Technology Laboratory
Iowa Statewide Solar Readiness Initiative CX(s) Applied: A9, A11 Date: 08/27/2013 Location(s): Iowa Offices(s): Golden Field Office
Advanced Biomass Feedstock Supply Chain for Lower Cost, Higher Quality Feedstock Delivery CX(s) Applied: A9, B5.15 Date: 08/26/2013 Location(s): Ohio, Iowa, Iowa, Kansas, Tennessee Offices(s): Golden Field Office
Innovative Gasification to Produce Fischer-Tropsch Jet and Diesel Fuel CX(s) Applied: A9 Date: 08/15/2013 Location(s): Iowa Offices(s): Golden Field Office
Sensitive Instrument Facility CX(s) Applied: B3.6 Date: 07/10/2013 Location(s): Iowa Offices(s): Ames Site Office
Liquefaction of Forest Biomass to "Drop-In" Hydrocarbon Biofuels CX(s) Applied: A9, B1.31, B3.6, B3.8 Date: 02/20/2013 Location(s): Iowa Offices(s): Golden Field Office
Stabilization of Bio-Oil Fractions for Insertion into Petroleum Refineries CX(s) Applied: A9, B3.6 Date: 01/15/2013 Location(s): Iowa, Oklahoma, Washington Offices(s): Golden Field Office
2009 National Biodiesel Foundation Biodiesel Infrastructure Project CX(s) Applied: B5.22 Date: 11/02/2012 Location(s): Iowa Offices(s): National Energy Technology Laboratory
Simpson College Boiler Plant De-Centralization CX(s) Applied: B5.1 Date: 09/24/2012 Location(s): Iowa Offices(s): Golden Field Office
Retroactive-Linn Hall Renovation and Installation of a 700 Ton Open Loop Ground Source Heat Pump and Related High Efficiency Heating and Cooling Systems at Kirkwood Community College, Cedar Rapids, Iowa CX(s) Applied: B5.19 Date: 08/30/2012 Location(s...