Installing and integrating SCADA-capable switches and fault indicators to facilitate system automation. An overhead to underground conversion of fe…
Circuit retirement, site prep, and directional boring. Conversion of ~750 linear ft of existing overhead circuit to underground. Installation of 3,…
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to Kraft Heinz Foods Company (Kraft) for Phase 1 of the 'Delicio…
Electrolysis to simultaneously produce hydrogen and copper sulfate. The electrolyzer will use recycled copper materials for one electrode and a pla…
Maintenance, repairs, renovations, and upkeep will focus on these systems: plumbing, building envelope, electrical, telecommunication, and research…
Installation of an Automated Metering Infrastructure System (AMI) - Replacement of electric meters with new meters capable of communicating with th…
Installation of overhead equipment attached to new utility poles, except the ISG switchgear, which is the installation of a padmount vacuum switchg…
Prairie Energy Coop. will replace existing three-phase oil circuit reclosers with three-phase electronic reclosers in forty-nine locations that com…
Installation of smart meters on all 3210 meters in the system to allow for real-time data infrastructure to monitor and control outages and assist …
The project involves installing underground electric circuits and installation of advanced protection and controls devices on existing utility pole…