The roof at EBR-1 sections 2, 3, 4 and the guard house (figure 1) have reached the end of their useful life. Preventative maintenance is required t…
This environmental checklist (EC) is being revised as a first tier EC, because shipping irradiated materials off-Site is not covered in the overarc…
The proposed action aims to address gaps in knowledge by determining the thermal conductivity of U-Pu-Zr fuels irradiated to various burnup levels.…
This environmental checklist (EC) covers a series of sodium fast reactor (SFR) experiments in the Transient Reactor Test (TREAT) Facility at Idaho …
Landowners adjacent to the Idaho National Laboratory (INL) Site’s northeast boundary have encroached on INL property. The proposed action surveys a…
Up to 17 survey lines are proposed for SASW testing near seismic velocity boreholes and existing INL seismic stations at: ATR (Figure R-1A), NRF (F…
As part of the JFCS, automation research and development will be performed. This research includes working with robotic systems outside of hot cell…
Pressure vessel manufacturing and assembly presents rate-limiting challenges for constructing new advanced nuclear power systems. Using current met…
The purpose of the proposed action is to promote safer traffic flow at the MFC complex through rerouting all delivery traffic away from the parking…
The proposed action replaces the dial pressure indicators with digital gauges and installs instrument calibration valves on the Advanced Test React…