BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g., cross arms, insulators, guy anchors, etc.)…
"The Advanced Modeling and Simulation organization needs to procure a new supercomputer to support advanced modeling and simulation (M&S). The new C…
The heating, ventilation, and cooling (HVAC) equipment for TRA-604 TRA Central Alarm System (TCAS room) needs to be replaced. The proposed action r…
"The advanced design and manufacturing for harsh environments research initiative at Idaho National Laboratory (INL) focuses on research and develop…
The proposed action upgrades power to meet for experiment usage at the Energy Systems Laboratory (ESL). The proposal adds 1.5 megawatts of electric…
The purpose of this revision is to capture additional project details. Activities defined in Phase II continue into Financial Year 2020. The projec…
Modifications to the walls and ceiling in the office located within the Materials and Fuels Complex-774 Zero Power Physics Reactor control room hav…
The Power Management organization at Idaho National Laboratory needs to perform maintenance and inspection activities on power poles and structures…
As part of the Joint Fuel Cycle Studies program, 4 grams of curium-244 oxide will be transferred from the Fuel Manufacturing Facility to the Hot Fu…
Pyroprocessing of spent nuclear fuel requires fuel rod decladding, oxide reduction, electrorefining, salt distillation, and cathode processing. The…