The proposed action aims to develop a next-generation high-temperature compact heat exchanger (HX) using additive manufacturing (AM) techniques wit…
Idaho National Laboratory (INL) is revising this environmental checklist (EC) from a second tier EC to a first tier EC and to clarify project scope.…
In 2016, Power Management identified the need to store heavy equipment indoors during adverse weather conditions. …
The proposed activity of this EC comprises two connected actions: • Replace several aging components of the ATR primary coolant system (PCS), and •…
This revision addresses two changes: 1) The categorical exclusion covering this activity was changed from B2.5 "Facility Safety and Environmental I…
The purpose of this Environmental Checklist (EC) is to address activities at any INL facility, building or structure, either in-town or at the INL …
The purpose of this Environmental Checklist (EC) is to address activities at any Idaho National Laboratory (INL) facility, building or structure, e…
The purpose of this revision is to capture additional work activities (soil sampling and asbestos disturbance) and environmental aspects. A discuss…
The Life Safety System (LSS) for the Specific Manufacturing Capability (SMC) and Test Area North (TAN) is over 20 years old, and replacement parts …
Fluor Idaho transferred the lease for TR-25 at the Materials and Fuels Complex (MFC) to Idaho National Laboratory (INL). …