Categorical Exclusion Determinations: Idaho Operations Office

The roof at EBR-1 sections 2, 3, 4 and the guard house (figure 1) have reached the end of their useful life. Preventative maintenance is required t…
This environmental checklist (EC) is being revised as a first tier EC, because shipping irradiated materials off-Site is not covered in the overarc…
Landowners adjacent to the Idaho National Laboratory (INL) Site’s northeast boundary have encroached on INL property. The proposed action surveys a…
Pressure vessel manufacturing and assembly presents rate-limiting challenges for constructing new advanced nuclear power systems. Using current met…