The purpose of this ECP is to address the environmental impacts of replacing the Big Shop's current spray booth with a new, larger, more modern spr…
The 'Co-Deposition Electrode Assembly for FCF Mk-V Electrorefiner' project is to design, build, and test a co-deposition electrode assembly in the …
The proposed project would rework the roadway to a proper slope and grade by creating a road base of compacted pit run gravel, geotextile fabric, g…
The project Defense Nuclear Non-proliferation (DNN) NA-22 Plutonium (Pu) Production Detection Reactor Venture objective is to obtain metallic parti…
In complement to the other activities described in the scope below, BWXT has fabricated TRISO fuel particles as a candidate fuel for the nuclear th…
The primary objective of the research and development (R and D) activities described in this Environmental Compliance Permit (ECP) is to obtain fun…
The purpose of this project is to advance manufacturing capabilities to improve energy efficiency.…
The project proposes to demonstrate this concept using isotope separation to measure weak or short-lived nuclear transitions using isotopes of Neod…
The proposed action installs new fiber optic cable (FOC) between the National and Homeland Security (N and HS) wireless cell tower No. 3 and the EB…
The U.S. Department of Energy (DOE established the Versatile Test Reactor (VTR) project the Department of Energy-Nuclear Energy (DOE-NE) Nuclear En…