Award Number: DE-EE0008895, CX(s) Applied: A9, A11, B3.6, B5.15, Water Power Technologies Office, Location(s): OR, Office(s): Golden Field Office
Award Number: DE-EE0009294, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): IA, Office(s): Golden Field Office
Award Number: DE-EE0008636, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): FL, Office(s): Golden Field Office
Award Number: DE-EE0008895, CX(s) Applied: A9, A11, B3.6, B3.16, B5.15, Water Power Technologies Office, Location(s): OR, Office(s): Golden Field Office
Award Number: DE-EE0008780, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): TX, Office(s): Golden Field Office
Award Number: DE-EE0008628, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): MA, Office(s): Golden Field Office
Award Number: DE-EE0009427, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): SC, Office(s): Golden Field Office
Award Number: DE-EE0009418, CX(s) Applied: A9, B3.6, B3.15, Advance Manufacturing Office, Location(s): IL, Office(s): Golden Field Office
Award Number: DE-EE0009359, CX(s) Applied: A9, Solar Energy Technologies Office, Location(s): CA, Office(s): Golden Field Office
CX-102099: Increasing Renewable Generation and System Reliability through Coupling PV and Hydropower
Award Number: DE-EE0009342, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): MD, Office(s): Golden Field Office