Categorical Exclusion Determinations issued by Fermi Site Office.
DOCUMENTS AVAILABLE FOR DOWNLOAD
The purpose of this project is to remove and replace approximately 300 feet of obstructed sanitary sewer pipe located along Kirk Road at the site b…
The purpose of the proposed action is to provide a safe, secure, and efficient entrance and roadway for construction vehicles accessing Fermi Natio…
The project team will collaborate with Fermilab experts and experienced industry partners to integrate the RGD system into the trailer and prepare …
The Utility Infrastructure Project (UIP) includes improvements to sitewide utilities to support Fermilab's mission over the next 40 years.…
The purpose of this project is to install approximately 1400 LF of 4" PVC domestic water supply (DWS) pipe feed into the existing 6" DWS pipe runni…
This document encompasses the design and full buildout of 55 dual-port EV charging stations at 29 proposed locations throughout the Fermilab site…
The final project is an expansion of the existing flood storage by excavation with the area already under an easement to the City of Batavia for st…
The purpose of the action is to dispose of the Nevis blocks, and this is needed because the longer the shielding blocks remain in storage, the grea…