Electrochemistry in Ionic LiquidsCX(s) Applied: B3.6Date: 02/02/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Raise the Tank26 High Liquid Level Conductivity Probe Setpoint to 362 InchesCX(s) Applied: B2.2Date: 01/31/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Demolish and Remove Two Handi Houses and Two Small Buildings in F-AreaCX(s) Applied: B1.23Date: 01/31/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Detoxification of Uranium in Soils and Groundwater Using Recycled ConcreteCX(s) Applied: B3.6Date: 01/27/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
K-Area Entrance Roadway ExpansionCX(s) Applied: B1.13Date: 01/26/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Repair a Leaking Duct Flange in F/H LabCX(s) Applied: B1.3Date: 01/26/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Rework Fire-rated Penetration Seal Per F-DCF-H-00591HB-Line Room 602A FloorCX(s) Applied: B2.2Date: 01/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
HB-Line Standpipe InstallationCX(s) Applied: B2.2Date: 01/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Wooden Pole Inspection/TreatmentCX(s) Applied: B1.3Date: 01/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Oil Cleanup in 100-NR-2CX(s) Applied: B6.1Date: 01/19/2011Location(s): Hanford, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office