BPA is planning on improving and reconstructing approximately 6 miles of existing access roads along the Hilltop-Warner No. 1 230-kilovolt (kV) hig…
WAPA proposes to apply herbicide at the recommended prescribed rate for weed control targeting Diffuse Knapweed on the CAR-KE 230kV off ROW and acc…
Award Number: DE-EE0009295, CX(s) Applied: A9, B3.6, B5.25, Bioenergy Technologies Office, Location(s): CA, Office(s): Golden Field Office
WAPA proposes to maintain a vegetation free zone around and adjacent to the poles using a combination of pre- and post-emergent herbicide applicati…
Award Number: DE-EE0009288, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0009346, CX(s) Applied: A9, B3.6, B3.11, Solar Energy Technologies Office, Location(s): AZ, Office(s): Golden Field Office
Award Number: DE-EE0007613, CX(s) Applied: A9, A11, B1.31, B3.6, Advanced Manufacturing Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0009329, CX(s) Applied: A9, B1.31, B3.6, Solar Energy Technologies Office, Location(s): CA, Office(s): Golden Field Office
WAPA proposes to perform all removal of the existing antennas, dehydrators and waveguides and installation of the new antennas, dehydrators and wav…
Activities: plug back existing wells, install sensors, cement well casing, test sensors, site restoration.…