This Amended Determination follows the approval of additional funds and extended period of performance to support the project team's small-scale, r…
This Amended Determination follows the approval of additional funds, period of performance, and new project performer (magniX USA Inc.) to support …
2 more:Valley Onward-Merced, CA
Conduct Phase I engineering studies, modeling work, and lab-scale experiments to develop (and subsequently field test if Phase I projects proceed t…
This project will design an optimized electrochemical system in anticipation of Phase 2 field trials in which sodium hydroxide (NaOH) will be elect…
Perform conceptual design studies to integrate the NRL Electrolytic Cation Exchange Module system within the OE Buoy wave energy converter to devel…
Project management, simulation work,electrolysis to methanol short stack of individually connected cells to test and validate methanol production f…
The purpose of the proposed project is to replace the existing underground storage tanks (USTs) and fuel dispensers at Building (B) 611 with new aboveground storage tanks (ASTs) and fuel dispensers.
This Amended Determination follows the approval of additional funds and period of performance to support the project team's continued small-scale, …
Funding will support the project's small-scale research and development of an air source heat pump steam generator that could seamlessly replace na…