2009 National Biodiesel Foundation Biodiesel Infrastructure Project CX(s) Applied: B5.22 Date: 07/23/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Carbon Dioxide Capture from Integrated Gasification Combined Cycle Gas Streams Using the Ammonium Carbonate-Ammonium Bicarbonate Process CX(s) Applied: B3.6 Date: 07/23/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Solar Decathlon 2013 CX(s) Applied: A9, A11, B5.1 Date: 07/16/2012 Location(s): California Offices(s): Golden Field Office
Development of High Performance Advanced Batteries for Electric Vehicle Applications CX(s) Applied: B5.1 Date: 07/16/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Development of Advanced Energy Storage Systems for High Power, Lower Energy-Energy Storage Systems CX(s) Applied: B5.1 Date: 07/16/2012 Location(s): California Offices(s): National Energy Technology Laboratory
California State Energy Program Annual Formula CX(s) Applied: A9, A11 Date: 07/12/2012 Location(s): California Offices(s): Golden Field Office
California-City-Westminster CX(s) Applied: B1.32, B2.5, B5.1 Date: 07/10/2012 Location(s): California Offices(s): Energy Efficiency and Renewable Energy
Bay Area Photovoltaics Consortium, Photovoltaic (PV) Manufacturing Initiative - Core Subawards CX(s) Applied: A9, B3.6, B3.15 Date: 07/03/2012 Location(s): California Offices(s): Golden Field Office
SANfab: Module Manufacturing Facility CX(s) Applied: A9, B1.31, B5.1 Date: 06/21/2012 Location(s): California Offices(s): Golden Field Office
High Efficiency Structural Flowthrough Rotor With Active Flap Control CX(s) Applied: A9 Date: 06/12/2012 Location(s): California Offices(s): Golden Field Office