Low Cost Arc-Fault Detection and Protection for Photovoltaic Systems-Tigo Energy, Inc. CX(s) Applied: B3.6 Date: CX: none Location(s): California Offices(s): Golden Field Office
Electro-Autotrophic Synthesis of Higher Alcohols CX(s) Applied: B3.6 Date: 09/27/2012 Location(s): California, North Carolina, North Carolina Offices(s): Advanced Research Projects Agency-Energy
High Efficiency, Low EMI and Positioning Tolerant Wireless Charging of Electric Vehicles CX(s) Applied: B3.6, B5.23 Date: 09/25/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Development and Productization of High-Efficiency, Los-Cost Building-Integrated Photovoltaic Shingles Using Monocrystalline Silicon Thin Film Solar Cells CX(s) Applied: A9, B3.6 Date: 09/24/2012 Location(s): California Offices(s): Golden Field Office
Intrinsic Fiber Optic Chemical Sensors for Subsurface Detection of carbon dioxide CX(s) Applied: B3.6 Date: 09/21/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Intrinsic Fiber Optic Chemical Sensors for Subsurface Detection of carbon dioxide CX(s) Applied: B3.6 Date: 09/21/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Intrinsic Fiber Optic Chemical Sensors for Subsurface Detection of carbon dioxide CX(s) Applied: B3.6 Date: 09/21/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Laboratory Scale Coal-Biomass to Liquids (CBTL) Production and Assessment CX(s) Applied: B3.6 Date: 09/21/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Interim Corrective Measures to Control Migration of Contaminated Groundwater CX(s) Applied: B6.9 Date: 09/19/2012 Location(s): California Offices(s): Berkeley Site Office
Radiography of Explosive Samples B321C CX(s) Applied: B3.6 Date: 09/18/2012 Location(s): California Offices(s): Lawrence Livermore Site Office