BPA proposes to remove a failed culvert and associated fill material. The work would include excavating approximately 20,000 cubic yards of existin…
Bonneville Power Administration (BPA) proposes to remove a critical transmission line impairment (P02646) along its Pearl-Keeler No. 1 transmission…
Bonneville Power Administration (BPA) proposes to fund Cascade Forest Conservancy (CFC) to install a series of beaver dam analogs (BDAs) and simila…
Bonneville Power Administration (BPA) proposes to conduct routine maintenance on access roads providing access to electrical transmission infrastru…
Bonneville Power Administration (BPA) proposes to remove retired radio equipment and antennas from the communication facilities at Capital Peak, Ol…
Bonneville Power Administration (BPA) proposes to fund the Kalispel Tribe’s ongoing resident fish habitat operations and maintenance in northeaster…
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe to conduct floodplain restoration repairs and revegetation efforts on a …
Bonneville Power Administration (BPA) proposes to create a loop from BPA’s Heyburn-Adelaide No.1 transmission line between existing structures 6/2 …
BPA proposes to allow Clallam PUD to interconnect their new substation into BPA’s existing Port Angeles Substation. Clallam PUD plans to convert th…
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of 18 wood pole structures and associated structural/electrical compo…