Bonneville Power Administration (BPA) proposes to correct impairments and to replace conductor and fiber on the 115-kilovolt (kV) Ellensburg-Moxee …
Bonneville Power Administration (BPA) proposes to fund the Walla Walla Basin Watershed Council to implement a low-tech process based restoration (L…
Bonneville Power Administration (BPA) proposes to fund Idaho Fish and Game to construct and replace five fish screens on private lands in the Upper…
BPA proposes to perform in-kind replacement of 46 wood pole structures and associated structural/electrical components (for example, cross arms, i…
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe (the Tribe) to improve fish passage and habitat at the Poley-Allen irrig…
BPA proposes to allow the US Army Corps of Engineers (USACE) to interconnect its Unit 6 turbine at Libby Dam to BPA’s transmission system on BPA’s …
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (for example, cross arms, insul…
Bonneville Power Administration (BPA) proposes to rebuild its approximately 20-mile-long, 115-kilovolt (kV) Benton-Scooteney No. 1 transmission lin…
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of 48 wood pole structures utilizing “light touch” removal techniques…
The Bonneville Power Administration (BPA) proposes to repair fiber cable on the Grizzly – Captain Jack No. 1 transmission line between structures 1…