Bonneville Power Administration (BPA) proposes to fund the Idaho Department of Fish and Game (IDFG) to implement the second phase of a habitat rest…
BPA proposes to rebuild an approximately 3-mile-long segment of the White Bluffs to Richland No. 1 115-kilovolt (kV) transmission line from Stevens…
Bonneville Power Administration (BPA) proposes to conduct activities listed below to operate and maintain high voltage electrical facilities throug…
Bonneville Power Administration (BPA) proposes to rebuild its Hood River Co-Op Service No. 1 transmission line from Hood River Substation to struct…
Bonneville Power Administration (BPA) proposes to remove and replace transmission structures and to remove and restring conductor and fiber optic c…
Bonneville Power Administration (BPA) proposes to purchase Salmon River Electric Cooperative, Inc. (SREC) equipment located in the switchyard of BP…
Bonneville Power Administration (BPA) proposes to remove and replace transmission structures and to remove and restring conductor and fiber optic c…
Bonneville Power Administration (BPA) proposes to remedy impairments to the Lancaster-Noxon No. 1 transmission line at thirteen locations along the…
Bonneville Power Administration (BPA) proposes to allow Umatilla Electric Cooperative (UEC) to construct new line segments to 4 of their existing 2…